biuro@griltex.pl Facebook LinkedIn

A green tram track is not an architectural detail.

It is a layered system that has to perform in real conditions.

In this type of application, the key issue is not only efficient drainage of excess water. What also matters is water retention, filtration and the long-term durability of the entire system under operating conditions.

That is why, in green tram track systems, geosynthetics are not an add-on.
They are an integral part of the system, affecting layer stability, water management and long-term performance.

At Griltex, we focus on materials that are expected to do their job not only on paper, but above all on site and in service.

General contractor: GW Tormel
Installation subcontractor: ABIES, Murowana Goślina

Back to news
06/07/2026
Events News

10th Anniversary Conference “Ground Conditions and Road Design and Construction”

The most valuable conversations about roads rarely focus on what is visible on the surface. It is the well-designed structural layers, effective drainage […]

Read more
10/06/2026
News Projects

Terminal T5 in Gdańsk

Some projects have an impact that goes far beyond the construction process itself. Terminal T5 in Gdańsk is a major project supporting the […]

Read more