biuro@griltex.pl Facebook LinkedIn

The latest implementation of retention tanks in the Economic Activity Zone in Zawiercie.

The water management related to the construction of engineering facilities and the operation of roads, as well as their appropriate management, should protect not only the environment but also the facilities themselves.

Properly designed reservoirs that optimally use natural spatial and hydrogeological conditions are an essential element when creating new investments.

We present the latest implementation of retention tanks using the dimpled membrane- GXP PLUS 900g in the Economic Activity Zone in Zawiercie.

Back to news
18/04/2025
News

Easter 2025 with GXP EGG – technology with a twist!

This Easter, we wish you: 🥚 peace – as tight as our membranes, 🥚 joy – as strong as our geotextiles, 🥚 and […]

Read more
17/12/2024
News

Griltex Polska – A History with French Roots and a Polish Vision for Growth

Did you know that Griltex Polska’s origins can be traced back to its collaboration with the French Griltex Group? The history of this […]

Read more